Most survey firms will tell you they can handle a multi-site programme, but the reality is often different...
The pitch is usually the same: nationwide coverage, repeatable workflows, scalable delivery. Sounds fine on paper.
What they don’t tell you is how often it falls apart in practice. Inconsistent data across sites, drawings that don’t match the CAD environment the client is working in, a project manager coordinating from a spreadsheet who never actually visited half the sites. The end client ends up with 40 survey files and no confidence they’re all telling the same story.
I’ve spent a lot of time thinking about what actually makes large, dispersed survey programmes work. Partly because we’ve delivered them, and partly because Paul Stilwell, who leads our Measured Building Survey department, has been doing exactly that across the UK for most of his career. When Paul joined NTB Survey, he brought a track record in this kind of work that I think is genuinely uncommon. It’s worth setting out what that looks like in practice.
The University of Manchester: 20 Buildings, 8,000 Rooms
Estate asset management programmes for universities are a particular kind of challenge. You’re not dealing with 20 identical buildings. You’re dealing with 20 buildings from different eras, in different states of repair, with a client who needs data that integrates into an asset management system, not just a folder of PDFs.
Paul worked on exactly this kind of commission at the University of Manchester. Full measured building surveys across approximately 20 buildings covering around 8,000 student rooms and associated facilities. The technical challenge is the consistency. When room attribute data needs to synchronise with a live database system, the survey output has to be built to a standard the whole way through. Not just on the first site and progressively less so as the programme runs out of steam.
That’s a discipline thing. It requires a project manager who’s engaged from day one to day done.
Tesco Express: Rapid Mobilisation Across Acquired Assets
The Tesco Express rollout programme is a different type of multi-site work entirely. The client was acquiring public houses across the UK (existing alcohol licences formed part of the acquisition strategy) and converting them into convenience stores. That meant measured building surveys had to support design teams working on conversion layouts under real time pressure.
The ability to mobilise rapidly across geographically dispersed, recently acquired assets and produce consistent, usable survey data each time is something you either have the infrastructure and experience for or you don’t. Paul delivered on exactly that brief. Repeatable workflows, consistent deliverables, and enough programme discipline to keep pace with a fast-moving acquisition and conversion strategy.
DVLA: Technically Sensitive RAAC Survey Work
Not all multi-site programmes are about speed and volume. Some require a different kind of precision.
Paul managed a nationwide survey support programme for the Driver and Vehicle Licensing Agency focused on reinforced autoclaved aerated concrete (RAAC), the structural material that’s been the subject of significant concern across the UK public sector estate in recent years. Approximately 45 buildings. Survey data used to assist structural engineers in identifying deformation and deterioration in ceiling and roof planks.
This is high-stakes work. The survey data isn’t feeding into a design; it’s informing a structural assessment. The margin for error is narrow, and the consequences of getting it wrong in a live, occupied building are serious. Paul managed that programme, produced the drawings, and prepared the calculations supporting the structural reporting.
Yorkshire Ambulance Service: 60 Sites, Live Operational Environments
One thing that gets underestimated in estate survey work is what it actually means to work inside a live operational environment. Ambulance stations don’t pause because a surveyor needs access. The work happens around operational activity, and the programme still has to deliver.
Paul worked on a measured building survey programme covering approximately 60 ambulance stations and depot sites across Yorkshire, capturing building geometry and asset data for integration into the client’s database systems. The project management burden on something like this is significant. Coordination across 60 sites, consistent standards throughout, data that’s actually ready for the system it needs to go into.
Nationwide Advertising Hoardings: 100 Sites, Laser Scanning Led
The advertising hoarding upgrade programme is the kind of project that benefits from a different approach to conventional site-by-site survey. Approximately 100 locations across the UK, with advertising boards transitioning from traditional poster formats to digital displays, each requiring topographic surveys to support planning, design and installation.
Laser scanning was the right tool for this. Rapid capture, high-volume delivery, consistent outputs. Paul managed the programme, coordinated nationwide survey delivery and produced the topographic drawings from point cloud data. It’s the kind of project where efficiency and scalability matter as much as technical accuracy.
Bury Council Care Homes: Fire Safety at the Local Level
Not every significant multi-site project is a national programme. NTB Survey recently delivered a measured building survey and fire plan production project across 12 care home facilities within the Bury Metropolitan Borough Council estate, right on our doorstep.
The commission involved surveying each property and producing accurate general arrangement fire plans, together with hardcopy A3 fire information files for installation in PIB boxes at building entrances. These are the files emergency services access when they arrive at a building. They need to be accurate. Paul personally managed the project, carried out the surveys and produced all the documentation.
Compliance-led survey work in occupied care environments requires a level of care and operational sensitivity that not every survey team has. We do.
What This Means for NTB
What the above projects have in common isn’t geography or sector. It’s the challenge of delivering consistent, high-quality survey data across a lot of assets, under real programme pressure, in environments that don’t always make it easy.
That’s the capability Paul brings to NTB’s MBS department. It’s the reason we’re positioning ourselves to work with universities, NHS and healthcare estates, local authorities, care operators, government agencies, facilities management teams and commercial portfolio managers who have exactly these challenges.
If you’re managing a complex property estate and you need survey data you can actually rely on, whether it’s ten sites or a hundred then let’s have a conversation – info@ntbsurvey.com